Installing windows!

On Tuesday Ryan and I harkened back to our earlier days of working together and took on a window install together. We had 8 windows to install before 4 o'clock. We got there around 9 in the morning and got to work... Would we get done in time? Had our "team work" become rusty from me living in Haiti for a year? I was a bit nervous about being out of practice since I hadn't installed windows for so long...

Since a few people have voiced doubt in my abilities in actual, physical work (yes, I'm talking to those of you who met me in Haiti who have thought I was just a computer geek, working at a desk all the time) I was inspired to the other day (after a conversation with one of those individuals) to demonstrate how window installation works- thus, hopefully giving you a glimpse at a side of my life which you really haven't seen yet.

First we start off the morning looking at a beautiful Iowa sunrise...
I know, no mountains, no forests, etc., etc., but it is pretty nonetheless.
I loaded the windows into the trailer while I waited for Ryan to arrive.

One essential thing for working well and efficiently is water.
However, there are times when an extra amount of flavor is... nice... ;)

So, here we begin with a window situated in the right wing of a bay window.
This is called a rope-and-weight double hung, named after the old fashioned weight and pulley system which assists the operator when opening the sashes. These are some of the most common windows you'll find out there. They are usually caulked or painted shut.


Step one is removing the inside "stops"
These retain the first sash in its track.

Use a molding bar to carefully pry the inside stop away from the window jamb.
Be careful not to damage the veneer and finish as you do this.

Once the stop is free from the jamb, place it in a safe place- it will be used later.

Now tilt the sash inside and pull up- like I said before, it may be painted or caulked in.
Use a molding bar to break it away if it is- be careful to pry on the outside edges of the sash, where the frame is; if you pry in the middle of the sash you might break the glass.

Place all the sashes you remove in a central location to be removed later.

Next, remove the "middle stop".
This retains the outside sash.

Use a hammer and molding bar to remove it.
Begin at the top.

Work your way down to the center of the window, 
where the upper sash's angled bottom will stop your progress.

BREAK the middle stop against the lower part of the sash.

Then start at the bottom of the middle stop and work upwards.
Once you reach the broken part, you should be able to just yank it free, 
pulling it out from the sash.



There is also a top stop- this usually comes out in one piece.
Take this off after the middle stops.

Beware of hidden surprises- sometimes (if the ropes of the pulley system are cut) 
the owner will have nailed the bottom of the sash- keeping it from falling down. 
This will hinder your progress severely :)
Remove any nails/screws/blocks and proceed.
Just be careful the sash doesn't come slamming down onto you after you remove these.
It is painful.
:)

In this case, the window was painted shut- even after all the stops were removed, 
it still wouldn't come loose as it should have.
If this happens, use your molding bar to pry against the outside stops 
(on the OUTSIDE of the window... makes sense, right?)
and lever against the sash- it should break free.
Do this on each side.

It should then be free to be pulled inside-
however, there are some pulleys on the top that might keep you from completely removing it;
also, there might be some more paint or caulk on the top of the sash that might retain it.


If that's the case, go to the top of the sash and pry down-
do this on each side of the sash.
If it still does not come down, you might have to go outside and cut it loose.

Once it's free, pull it down; this will expose the rope and pulley system.
Cut the ropes if they are not already.

The pulleys will present a problem when installing the new pocket replacement unit.


Use a hammer.

Flatten them like this. You have to do this on either side.
Some variants are extremely hard and have screws holding them in. 
These must be removed completely and the holes filled with expanding foam.

At this time (if you didn't already) check the opening for rogue nails that didn't come out with the stops.
Remove them with your hammer or molding bar.

Lift the pocket replacement unit into the opening.
Slide the upper sash open.
Ensure the unit is pressed up against the outside stops.
Check the spacing on either side of the unit. It should be equal. 
If necessary, lift the unit up until the space on the top is the same as the sides, 
and screw it in place on the top. The screw should be tightened until it just touches the vinyl.

However, before you screw it into place, lift the top sash up until it's barely open-
At a glance, you can see if the window is square or not.
If the space between the sash and the frame is equal, your window is square- it one side of the gap is larger than the other, adjust the window up or down on either side to make it equal.
It is imperative the window be perfectly square. The old window opening may not be, so you may need to install the new unit "crooked" in the opening- that's ok, so long as it's square.
This is possibly the most important step; if it's not square, it will make the window leaky and can even cause damage to the locks and keepers.

Once it's square, screw the bottom in place on either side.
Be careful not to over, or under tighten the screws.

Now, lift the top sash all the way to the top, into position. 
Next, lift the bottom sash up about 2" and tilt it inward.
You'll be putting a screw inside the jamb, in the place indicated in the picture above.


As the screw goes through the vinyl, make sure the drill bit doesn't skip out and damage the veneer.
As the screw bites into the wood, it will bend the replacement unit's jamb towards the center of the opening; you want this to happen. Look at the weather stripping between the sash and frame and make sure there's no gap- it can even be a bit squished, but not too much. 
The sash should still be able to operate smoothly and not be stiff. 
Again, your screw head should just touch the vinyl- not too tight, not too loose.
If there is still a gap in the weather stopping, 
it may be necessary to pull the jamb yourself as the screw goes in.

Once you have done that on either side, snap the sash back into place and operate both sashes.
They should slide smoothly, all the way, up and down. If one is sticky, you may need to tighten your side screws. Ensure the locks work correctly. Check square again. I usually have about a 1/8" tolerance for being out of square- depending on the model of window and the size. On one like this, I aim for 1/16" tolerances. 

So there you have it! The new unit is now installed and all you have to do is foam around the perimeter and replace the inside stops. The outside can either be caulked or have aluminum cladding installed. On this job, we cladded the outside trim and also stained and installed some new trim on the inside.

So, did we make our deadline for that day? 
I'm thankful to say that the Lord blessed our labors and we were out of there by about 4:15!

So hopefully that gives you a bit of insight into what I do for a living here in the States... Besides drywall finishing, I think installing windows is my favorite job to do :)

Next blog post I'll have some on a wedding we went to...

God bless,
-nate

Sunday, February 3, 2013

Playing catch-up

Well here I sit, Sunday evening, it's late, just got done with an hour-long conversation with the new secretary for down in Haiti, now I'm listening to some nice singing and trying to think of what all I've done in the last week and a half since blogging last :)

I guess this is what you call "playing catch-up"

:-/

A couple weeks ago we went out to Nebraska and practiced singing some songs with the Smith family. We'll be singing at a wedding this next weekend.
While there I worked with Aaron and Micah of Saturday.
We worked at a large college dorm that was being remodeled.

The view from an upper window- quite the field out there!

This is what I worked on- putting whips (the coiled flex conduit) on the ceilings.
It was great fun and simple enough that even my half-brain could understand and accomplish it :P

Here's one of the "finished" rooms. It was still getting the final touches applied, but this was about it...

Ah, drywall mud!! I'd rather do that than wiring, but you know, one must do what one must do :)

A main hallway. There were 7 floor to do.

The infamous staircase- after running down all 7 flights one gets a little dizzy from all the turning!

Micah, trying to fish some wire down to an outlet, where Aaron waited in anticipation.

Fast forwarding to this week... we had a nice snow storm- dumped about 5" and blew for a day or so.

Driving into Griswold- our hometown.

And... Casey's general store! Great pizza, nice selection of Gatorade, good sales on Frappachino's and... wait, it that a beer truck? Sorry.... :-/ It IS a general store of the world, so... there's just certain things you just don't buy there!!

I've been studying up for MMI and it's been pretty intense at times... Here's the first book I'm studying. I'm also going through a DVD set (did I mention that previously? Can't remember) on Anatomy and Physiology. Intriguing stuff...

And finally a deck we finished up the other day! It was really fun...

Decks are one of my favorite structures to build... something about that wood that's just pretty.

Trying to get everything JUST right is really enjoyable too...

This one was fairly simple too, so that helped it go faster :)
The weather was so cold my feet kept going numb and my fingers would hurt and grow stiff.
So, Ben suggested I get some heat packs at Casey's... so off I trooped to get some. 
I ended up getting 4 double packs so there would be some to go around. It helped a lot, and I got some fresh potato wedges for the guys- flaming hot, well seasoned slices of warm goodness on a hot day. It was very rewarding to see everyone's faces when I pulled them out- it was great to have them on a cold day!

Ryan showed up on day 2 of working there with some hot chocolate- yum :)
The guys worked great, considering it was REALLY cold out! Great job guys...

That's all for now I guess. It's about 11:30pm here and we've got to hit a siding job hard the next 3 days, so I'd better hit the hay :)

God bless you all!

-nate


Saturday, January 26, 2013

The sick days...

Ah yes, the last 3 days have been uneventful- starting Thursday I came down with a fever and cough bad enough that I have had to stay home from work... trying to sleep, trying to get better, but not really being successful until today.

So, there's not much to talk about :) I listened to several good sermons and lots of good singing, thats for sure :)

One of the sermons that was a real blessing to me was "The friend of God" by Bill Mcleod- if you have a chance to listen to it, definitely look it up on sermonindex.net

Lord willing, I'll be preaching tomorrow- if my throat holds up and the fever doesn't come back :)

Well, that's about it for now :) God bless!

-nate

Wednesday, January 23, 2013

Throwback to Haiti days-- A bandage patient!!

The other night my cousin Ben came over and told me he knew I enjoy medical stuff, so he brought his bandage supplies for his finger- remember, the one he cut on the table saw?

I was elated :D

So, I donned some rubber gloves (some that I accidentally carried home from Haiti, actually... oops...) and removed the bandage. I asked him how often they told him to clean it and they suggested every so often- but he hadn't cleaned it for a few days, so I decided to go the whole nine-yards- "sterile" environment, rubber gloves, disinfectant (hydrogen-peroxide) and of course, the new bandages.

It was really fun. He was a good sport, entertaining my craving for some real-life med-stuffs :) I even asked him if he wanted me to trim off the dead tissue- to which he gave a violent reaction in a negative sense, so I didn't...

Thus, even though it was very simple and routine, it brought back so many good memories of the clinic in Haiti that it really made my day :)

The flesh has filled in the chunk that was missing and is looking pretty good...

He's on strong antibiotics, so there's not much fear of infection... 
but I cleaned it all the same- it's just a good idea, right? Those of you that are in the clinic down there??
:)

But the inevitable happened- the next day he comes to work, complaining that ever since I cleaned it, the finger had been hurting. Is it always the "doctor"'s fault?? :) Even today after church he came up to me and said it's still hurting. I told him it's probably a good sign; that the nerves were dying and I revived them and saved them from immanent death :P He didn't think so, but I told him it's good he has feeling in it. 

Any thoughts on why it would hurt after it was cleaned like that? All I did was pour peroxide over it and daub it off afterward...

We had a very nice prayer meeting tonight at church. It's always so refreshing to gather around and pray as a brotherhood- so much good comes out of hearing each others' hearts...

God bless you all!

-nate

Monday, January 21, 2013

Lessons in selfishness...

The last few days it seems like the Lord has been teaching me lots in the area of selfishness and patience- not just because Ryan preached about honesty and patience last night during Bible study, but also because of the circumstances which have occurred recently...

First off, there have been longs weeks of work- yes, time in the evenings to do things, but we have been working 6 day work weeks so the spare time I became accustomed to in Haiti has become a memory of the past. At first I really was annoyed at the lack of "spare time" but the Lord had something to teach me about selfishness through it all- when Saturdays rolled around, I would wake up and have to come to grips that today was not the "day off" but rather another day of work. Why can't I have time for myself? Why is it that we put so much time in for these customers and their happiness and satisfaction, when we ourselves are just getting worn out?

However, as the Lord worked on my heart, I realized how very much selfishness I had inside- though it might not be the best thing to wear yourself out for a job, this was at the least a lesson for me. I was thinking about "Me, me, me!!" and not wanting to be a blessing to others.

The second came one day when I was planning on staying home to stain a bunch of trims and doors- it would have been nice to spend time in our basement listening to music, preaching, etc, and just stain trim... but then Dad informed me that Ry would be doing that and I would be going out to the job site with Josh and him. Unfortunately, my response in my heart was not a good one- isn't it amazing how self can be cloaked in such "good" motives? I didn't say anything outwardly, but inside I was not pleased at all! As I began to resign myself to the fact that I couldn't have my way I realized how selfish I was being... as the conviction came, my heart started to break and see itself as it was; petty and selfish, not wanting to give others the best and take the low road myself.

I determined right then and there to make a point in the future to take the jobs others didn't want and try my best to bless others rather than myself... great commitment, right? :)

Ah yes, I am so thankful our Heavenly Father knows our frame, that it is but dust- the rest of that day was fraught with times and opportunities for me to live that out- only for me to fail multiple times! At the end of the day I realized how much I had to grow in the area of selfishness!

And such is life on this earth :) and such is life with Christ- a continual process of sanctification and growing in grace and the knowledge of Him. May our love for Him motivate our actions to be obedience to Him and seek to serve Him in a more acceptable way today than yesterday...

Anyhow, that's some of what I've been learning in the school of life recently :) Onward to the pictures, then! :)

In other news...
I have applied for a 2 week-long medical course (Missionary Medical Intensive, or more commonly known as "MMI") and received my acceptance letter the other day! I'm very excited to take this next step to hopefully be able to go back to Haiti as a clinic worker in the next 2 years or so...

On my way to work one morning... :)

My cousin Ben cut the tip of his finger off with a table saw one day at the job, so I was elected to run him to the ER- it spiced up an otherwise "normal" work day ;)
Thanks Ben :)


And here is some of what we were doing that next day- hardwood flooring!

Mom visiting and bringing us lunch!


Ah yes, the outside of the job....

Some of the the infamous trim I thought I would be staining :)

After putting the floor in we were installing some cabinets.

The end of a long day of work! Ben and I were walking around outside, double checking the cleanup, while Dad and Don packed up the equipment.

A half-day's work of labor:
We built the wall on the left side of the stairs, put a floor over it, built a railing and drywalled it. 
Now the customer will have more storage space! :)

And finally, we began trimming everything out last Friday!
It looks pretty good, in my opinion- mostly because we've been learning from neat tricks from Don about finish carpentry :)

God bless you all! Keep Him first!

-nate

Saturday, January 12, 2013

Getting things done!

Ah yes, here we are, fairly well removed from the new year and I haven't written on here for a long while :-/

Such is life, as they say... Here are some pictures I took at the job today...